A new stud wall is rarely just a frame and some plasterboard. The finished price depends on sound insulation, door openings, electrical work and how the new wall meets existing floors and ceilings. Dividing a room to create a bedroom also raises questions about escape, ventilation and whether the remaining spaces still work safely.
FirstR8 Builds carries out studwork and room formations in West Sussex, starting with a free, no-obligation initial site consultation and then a detailed quote. Use these rough guide ranges to prepare a budget, not to order work without a survey. Agree the room layout and any building control requirements before comparing construction prices.

Guide costs per metre and per completed wall
All prices here are rough guide ranges only, not quotes, excluding VAT where applicable. For a straightforward non-load-bearing partition around 2.4 metres high, allow roughly £120–£200 per linear metre for a basic frame, mineral wool infill and standard plasterboard to both sides. This excludes skimming, decoration, doors, electrics and alterations to existing finishes.
A simple three-metre wall with that basic specification might therefore be roughly £360–£600, but small-job minimum charges and difficult junctions can increase the total. For the same uncomplicated wall skimmed on both sides, a rough overall guide is £600–£1,000, still excluding doors, decoration, electrical work and significant making good. Do not add the basic wall figure to this finished-wall allowance.
For a straightforward internal doorway formed within the new wall, allow an additional rough guide of £350–£700 for framing the opening, a basic lining, standard door, ironmongery and fitting. Specialist acoustic or fire-resisting assemblies cost more. Any advertised square-metre rate should explain whether it measures one wall elevation or both faces.
Timber or metal stud: compare complete systems
Timber framing can be useful where joinery, door linings and future fixings need straightforward support. Light-gauge metal systems offer another option, with components selected to suit wall height and performance. Neither is automatically the cheapest once boards, insulation, fixings and installation details are included.
Ask for the proposed wall thickness, stud arrangement, board specification and any required fire or acoustic performance. A system with additional board layers is a different scope from a basic single-layer partition. The contractor should follow the relevant system details rather than mix components on the assumption that every stud wall performs alike.
Plan reinforcement for heavy shelves, radiators, televisions or fitted cupboards before boarding closes the frame. Adding suitable backing during construction is usually simpler than opening the finished wall later. Confirm the intended loads rather than assuming ordinary plasterboard fixings will suit everything.
Acoustic insulation and what Part E means
Mineral wool inside the frame can improve sound control, but the complete construction matters. Board mass, sealed perimeters, sockets and gaps around doors all influence performance. A hollow lightweight door or sound travelling through adjoining floors can undermine an otherwise carefully built wall. Discuss speech privacy rather than asking for an unspecified ‘soundproof’ partition.
In England, Part E addresses resistance to sound. In new dwellings and relevant conversions, including material changes of use, internal walls between bedrooms and other rooms, and between a WC and other rooms, can fall within its requirements, subject to stated exceptions. Separating walls between dwellings have different, more demanding requirements. Building control should confirm which provisions apply to the project.
Do not assume every new partition in an existing house needs a formal sound test, or that simply adding acoustic quilt proves compliance. Request a specified wall build-up where performance is required. Additional board layers, resilient details and attention to flanking sound paths may be necessary and should be priced before work starts.
Door openings, skimming and electrical allowances
Position the doorway around circulation and furniture, not just the easiest gap between studs. Check clear access, door swing and clashes with another door. The quote should say whether it includes stops, architraves, handles, latches and finishing. A fire-resisting door requirement changes the assembly, not just the price of the leaf.
Plasterboarding is not the same as a decorated finish. Identify whether the wall will be skimmed or receive an appropriate taped-and-jointed finish, and include junctions with existing surfaces. Matching textured ceilings or repairing a damaged floor where a partition meets it can involve additional work beyond the new wall faces.
Sockets, switches, lighting and radiator changes need separate coordination. Electrical work must meet Part P where applicable, and some work is notifiable. Ask an electrician to confirm the scope, testing and certification. Concealed cables and pipes should be identified before fixing the frame, and any service alterations agreed in writing.
Creating a bedroom needs more than a dividing wall
Before turning one room into two, check that each proposed room has a suitable escape arrangement and ventilation. A new bedroom must not create an unsafe inner-room situation or compromise the existing escape route. Emergency escape windows may be needed depending on the layout and storey; a window that opens is not automatically an adequate escape window.
Ask building control or the designer to establish the fire-safety approach under Part B, alongside ventilation under Part F. Check heating, smoke detection and the effect on adjoining rooms. Natural light and outlook are important design considerations, with planning, housing or licensing standards potentially relevant in particular cases; do not assume borrowed light makes every bedroom proposal acceptable.
For a bungalow, splitting a large bedroom may look simple, but window positions and door access can determine whether the layout works. In loft rooms, roof slopes and the protected stair arrangement need particular care. Settle these constraints before spending money on detailed joinery or decorating choices.
When to check building control and other permissions
A simple non-load-bearing partition does not always require a building regulations application on its own. Approval may be needed where the work forms part of a conversion, changes escape arrangements, affects regulated construction or involves structural alterations. Ask building control about the actual proposal rather than relying on a blanket rule for stud walls.
Internal partitions do not usually require planning permission for an ordinary house, but listed building consent may be necessary for changes affecting a listed building’s character. Flats, lease restrictions and changes of use raise separate questions. Check with Arun, Chichester or Adur & Worthing councils, or the South Downs National Park Authority where relevant, if the proposal involves planning considerations.
Before fixing anything, establish that the wall is genuinely a new non-load-bearing partition and that its support is suitable. Cutting existing structural members or changing a load-bearing wall needs a separate design and scope, not an allowance hidden inside a partition price.
A useful quote starts with a marked-up layout
At the free initial consultation, show the proposed room division, furniture positions and existing services. The detailed quote should reference an agreed layout with wall length, height, door position and finishes. If opening up is needed to confirm conditions, ask how findings and additional costs will be authorised.
- Specify the complete framing, insulation and board build-up, including any performance requirements.
- Include door components, skirting, architraves, plaster finish and junction repairs, or mark them excluded.
- Separate electrics, heating changes, decoration, flooring repairs and building control charges.
- Confirm access, waste removal, VAT treatment, payment stages and responsibility for approvals.
Timescales, preparation and completion checks
A straightforward partition may take one or two days to frame and board, with plastering and other trades extending active work to several days. Drying before decoration adds elapsed time. Doors, electrical visits and any inspections need sequencing, so ask for the full programme rather than only the carpenter’s attendance.
Clear both sides of the proposed wall and provide access for long materials. Agree dust protection, cutting space and arrangements for any temporary power interruption. Keep photographs of backing and service routes before boarding. At completion, check door operation, sockets and finish quality, and collect relevant electrical certification and building control completion documents where applicable.
Frequently asked questions
- Is a metal stud wall cheaper than timber?
- Not necessarily. Height, performance, labour and the full board specification affect the total. Compare complete wall systems rather than the framing material alone.
- Can a partition be built over a floating floor?
- Do not assume so. The wall needs suitable support, and floating flooring needs movement allowance. Agree the base detail and any flooring removal before installation.
- Will acoustic insulation make the room soundproof?
- No. It can help within a suitable wall build-up, but doors, gaps and adjoining construction also transmit sound. Set realistic privacy requirements before specifying the wall.
- Do I need approval to make an extra bedroom?
- It depends on the work and property. Check escape, ventilation and building regulations with building control before proceeding, and investigate planning or licensing requirements where relevant.
- Can I decorate as soon as the wall is skimmed?
- Wait until the plaster is sufficiently dry and follow the paint manufacturer’s preparation instructions. Drying varies with conditions, so do not fix a decorating date from plastering time alone.