What should you budget for a bathroom renovation?

A bathroom refit can mean replacing fittings in the same positions or rebuilding the room around a different layout. The visible suite is only part of the price. Substrate repairs, waterproofing, drainage, ventilation and electrical work determine whether the new finishes have a sound foundation and remain practical to use.

FirstR8 Builds provides bathroom fitting and refurbishment work from Bognor Regis across its West Sussex service area. A free, no-obligation initial site consultation helps establish the scope before a detailed quote. Use the rough guide figures below for planning only, then price the room, products and installation requirements together.

FirstR8 Builds bathroom renovation costs work in West Sussex

Rough guide bathroom refit costs

For a small, straightforward bathroom retaining its layout, a rough guide range only is £5,000–£8,000 including standard fittings, installation and VAT where applicable. A more complete mid-range refit is roughly £8,000–£14,000, while extensive alterations, higher-specification products or substantial repairs can bring a rough guide budget to £14,000–£22,000 or more. These are not quotes.

For a compact en-suite, a rough guide range only is £4,500–£9,000 where services are conveniently available. Creating a new en-suite with partitions, difficult drainage and additional electrical or ventilation work may instead need a rough guide allowance of £8,000–£15,000 or more. Small floor area does not remove the cost of specialist work.

Confirm what each figure includes. A supply-only suite price is not a completed bathroom price, and installation-only quotes may exclude tiles, adhesive, waste fittings and delivery. Compare budgets against a written product schedule rather than photographs or broad labels such as “luxury”.

Layout, hidden repairs and product choices

Keeping the WC, shower and basin close to existing services usually reduces alterations. Moving a WC can be particularly consequential because the soil connection needs a suitable route and fall. A level-access shower also needs enough construction depth for its drain and waterproof floor assembly; it is not simply a thinner tray.

Once old fittings and tiles are removed, damaged boards, leaking pipework or weak flooring may become apparent. Ask how discoveries will be recorded and priced before repairs proceed. A contingency is sensible, but it should not replace a defined initial scope or a clear approval process for extra work.

Large-format tiles, niches, mitred corners, concealed valves and wall-hung fittings can increase preparation and installation time. Confirm access to serviceable parts. Good-looking concealed fittings become inconvenient if a future repair requires breaking tiles because no access panel or removable component was considered.

Waterproofing before tiling or wall panels

Tiles and grout are not a complete waterproofing system. Wet areas need suitable backgrounds and a waterproofing approach appropriate to the shower or bath arrangement. Tanking details should address corners, joints, pipe penetrations and the connection to trays or drains, following the chosen system’s instructions.

Ask the quote to identify wet-area preparation rather than leaving it as “tile walls”. Existing plasterboard or timber flooring may need replacement or strengthening, and proprietary boards still require correctly detailed joints and fixings. Mixing unrelated products without checking compatibility can undermine the intended system.

A wet room needs particular care with floor falls, drainage capacity, threshold details and protection beyond the immediate shower position. Agree the build-up before ordering a screen or drain. Waterproofing should be completed and checked before it disappears behind the finished surface.

Bathroom electrics and ventilation requirements

Bathroom electrical zones affect which fittings can be installed and the protection they need. Zone boundaries depend on the bath or shower arrangement, so have a competent electrician assess the actual layout. Lights, fans, shaver supplies and electric heating must be suitable for their positions, not simply described as bathroom products.

Part P applies to electrical safety in dwellings. New circuits and certain work in bathroom special locations are notifiable; not every replacement accessory is. Agree who designs, tests and certifies the work, and how any required notification will be handled. Appropriate RCD protection and current wiring requirements should be checked as part of the electrical scope.

Part F guidance gives an intermittent bathroom extract rate of at least 15 litres per second. The installation must achieve suitable extraction through its actual duct route; a fan’s headline rating alone is not proof. Agree external discharge, make-up air, controls and any overrun requirements with the installer. An opening window does not automatically replace mechanical extraction requirements for applicable work.

Boxing in pipes and creating an en-suite

Boxing can hide pipework neatly, but it reduces usable space and must allow access where maintenance is needed. Agree its dimensions before choosing a vanity unit or shower enclosure. Insulate or support pipework as appropriate and discuss ways of reducing noise rather than treating boxing as a cure for every sound.

For a new en-suite, establish the soil connection, hot-water supply and ventilation route before fixing the bedroom layout. A pump or macerator should not be assumed to be the default answer to difficult drainage. Discuss maintenance, noise and practical alternatives if gravity drainage is awkward.

New partitions, door swings and floor levels affect how both rooms function. Check that the remaining bedroom still has useful furniture space. Building control may need to consider the new accommodation and services; obtain advice early rather than discovering that a concealed duct or waste route needs redesign.

What a detailed bathroom quote should include

A useful quote identifies the room layout and products by model or a clear allowance. State who supplies each item and who checks compatibility. Owner-supplied fittings can work well, but late deliveries, missing components or unsuitable valves need an agreed responsibility before the installation starts.

Ask for VAT treatment, payment stages, exclusions and a written variation process. Clarify disposal, parking and delivery arrangements, particularly on streets with restricted access. Decorating and repairs outside the bathroom should be explicit rather than assumed.

  • Strip-out, waste removal, protection and temporary service arrangements.
  • Floor and wall preparation, waterproofing system and tiling extent.
  • Plumbing, drainage, heating, electrical work and mechanical extraction.
  • Suite, taps, screens, furniture, accessories, boxing and maintenance access.
  • Testing, certification where required, sealants and final making good.

Order of works, timing and preparation

The free initial site consultation should establish the layout, existing problems and your budget priorities. Once the specification and quote are agreed, confirm product availability before setting a start date. A typical sequence is protection and isolation, strip-out, inspection, first-fix plumbing and electrics, substrate repairs, waterproofing, tiling, second-fix fittings and testing.

As a rough programme guide, a straightforward refit often takes two to three weeks on site; extensive repairs, layout changes or complex tiling may take three to five weeks or longer. Drying and curing periods must follow product guidance. Finishing faster is not a good reason to cover damp backgrounds or use a shower before sealants cure.

Empty cupboards, remove personal items and agree a safe delivery area. If this is your only bathroom, plan washing and toilet arrangements in advance; daily reinstatement may not be possible. At handover, check drainage, extraction, controls and access panels, and collect electrical documents and product instructions. Book FirstR8’s free, no-obligation site consultation to discuss a realistic scope before ordering fittings.

Frequently asked questions

Is keeping the existing layout cheaper?
Usually it reduces service alterations, but damaged backgrounds or outdated services can still require work. Compare complete scopes rather than assuming a like-for-like refit needs no preparation.
Do I need tanking behind shower tiles?
Wet areas need an appropriate waterproofing system. Ask the installer to specify the background, joints, penetrations and tray connection rather than relying on tiles and grout alone.
Can I use the bathroom during the refit?
Not reliably throughout. Water isolation, floor work and curing periods can make it unavailable. Agree any temporary arrangements before work starts.
Does a bathroom fan have to vent outside?
Extracted moisture should discharge outdoors through a suitable duct, not into the loft or another internal void. The route and resistance need considering when choosing the fan.

Talk to us about your project

Book your free, no-obligation initial site consultation. We cover Bognor Regis, Littlehampton, Chichester, Worthing, East Preston, Findon, Rustington.

07346 814853

Unit B, Lelliot and Co, Ash Grove / Heath Place, Bognor Regis PO22 9SL · Monday to Friday, 8am – 7pm