The advertised price of a board is only one part of a finished floor. Installation method, the condition underneath and the details around doors and skirting can change the total substantially. Before comparing fitting rates, establish whether they describe laying boards on a ready surface or completing the whole job from removal to finishing.
FirstR8 Builds offers a free, no-obligation initial site consultation followed by a detailed quote for carpentry work in West Sussex. The rough guide ranges below help you compare options before that visit. They are not a quote: an inspection and product specification are needed to establish preparation, compatibility and the final scope.

Fitting rates per square metre: a rough starting point
All prices on this page are rough guide ranges only, not quotes, excluding VAT where applicable. For straightforward installation onto a ready, suitable subfloor, labour might be £15–£25 per m² for laminate, £20–£35 per m² for floating engineered wood, and £30–£50 per m² for solid timber. Engineered boards installed with adhesive might attract a rough labour guide of £25–£45 per m².
These labour figures exclude boards, adhesive, underlay, moisture-control products, preparation, waste disposal and finishing trims. As separate rough supply-only guides, laminate might be £15–£40 per m², engineered wood £35–£90 per m² and solid timber £45–£110 per m². Premium products can exceed these ranges. A small hallway may have a minimum job charge rather than a simple area calculation.
Herringbone, borders, numerous doorways and narrow corridors involve extra setting out and cutting. Ask for those layouts to be quoted specifically. Measure the actual area separately from the purchasing quantity: cutting waste depends on layout, board dimensions and the manufacturer’s recommendations, not a universal allowance.
Floating, glue-down or secret-nailed installation
Floating floors rely on a compatible joint system and suitable underlay, without fixing boards to the subfloor. They can be economical where the substrate already meets the product’s requirements. Not every engineered board is approved for floating installation, and solid timber should not be assumed suitable simply because its edges have a tongue and groove.
Glue-down installation needs an appropriate adhesive and a sufficiently flat, sound and dry substrate. Removing old adhesive, preparing a screed and applying a compatible moisture-control system can cost more than the laying labour. Ask the quote to identify the complete preparation system rather than a vague allowance for glue.
Secret nailing is an option for suitable products over an appropriate timber substrate. It is not a solution for loose joists, weak decking or a damp floor. Confirm fixing lengths and hidden-service risks before work begins, particularly where pipes or cables run close beneath existing boards.
Subfloor preparation can determine the budget
A site inspection should assess flatness, movement and moisture before the installer commits to a laying method. Moisture testing and the flooring manufacturer’s limits matter more than how dry a surface looks. Where the old finish hides the substrate, request a provisional preparation allowance and a clear process for agreeing additional work once exposed.
As rough guide additions, a straightforward smoothing-compound application might be £15–£30 per m², while suitable plywood overlay to an existing timber floor might be £20–£40 per m² supplied and fitted. These are alternative preparation examples, not automatic charges to add everywhere. Depth, primers, board thickness, fixing requirements and repairs can move the price outside those ranges.
Ordinary plywood is not a universal cure for damp or unevenness. Loose boards should be secured, movement investigated and incompatible residues addressed. Structural repairs, persistent damp and significant changes in level need their own diagnosis and scope rather than being hidden beneath the new finish.
Allow for removal, thresholds and the room edges
Removing a loose-laid floor is different from lifting bonded timber or breaking out tiles. As a rough guide only, straightforward floor lifting and disposal might add £5–£15 per m², with difficult bonded finishes separately quoted. Suspect old tiles or adhesive should be assessed before disturbance, since some older materials can contain asbestos.
Choose whether skirting will be removed and reinstated, replaced, or left with a compatible perimeter trim. Trims can reduce disturbance but give a different appearance. Removing skirting can damage plaster and paint, so allow for making good. Doorways need agreed thresholds and sensible transitions to adjacent finishes, especially where floor levels differ.
Door trimming and architrave undercutting should be explicit items. A higher finished floor can affect door swing, appliance removal and kitchen plinths. Fire doors cannot simply be shortened without checking permitted clearances and trimming limits. Agree these details before ordering a thicker board or underlay.
Acclimatisation, expansion and underfloor heating
Arrange delivery and storage to follow the manufacturer’s acclimatisation instructions. Some products need time in controlled room conditions; others have different requirements. Wet trades should be complete and sufficiently dry, with normal heating and ventilation established. Leaving boards in an unheated garage is not equivalent to acclimatising them in the room.
Expansion gaps are needed where specified around edges, pipes and other fixed obstructions. Their size and the need for intermediate breaks depend on the product and room dimensions. Do not ask the installer to remove these provisions for a tighter-looking fit. Fixed joinery and heavy fitted units must be considered when planning a floating floor.
For underfloor heating, check the exact board, underlay, adhesive and heating system together. Engineered wood is often an option, but not every product is approved; solid wood needs particular care. Follow specified moisture checks, commissioning procedures and temperature limits. A promise that a floor is simply ‘heating compatible’ is not a complete installation specification.
T&G chipboard and structural decking are separate work
Replacing structural tongue-and-groove chipboard decking is different from fitting a decorative finish. Price it separately, with the board grade and thickness matched to support spacing, loading and the design. Edge support, joint treatment, fixings and access to services should be agreed before covering the structure.
For straightforward replacement over sound, accessible joists, a rough guide might be £35–£60 per m² for basic structural chipboard supply and fitting. This excludes joist repairs, insulation, service alterations and decorative flooring. Rotten timbers or excessive movement require investigation rather than a thicker sheet installed over the problem.
Turn the site visit into a clear written quote
During the free initial consultation, show adjoining rooms, access routes and any uneven areas. Share the proposed flooring product and explain whether furniture can be moved elsewhere. The detailed quote should distinguish measured floor area, material quantities, preparation allowances and finishing details.
- Identify supply responsibility, delivery, storage and the approved installation method.
- Specify removal, disposal, moisture testing and preparation, with provisional items clearly marked.
- List underlay or adhesive, trims, thresholds, skirting work and door adjustments.
- Confirm VAT treatment, payment stages, exclusions and written approval of extra work.
Prepare the room and agree a realistic programme
A straightforward room may take one or two days to lay once its substrate is ready. Removal, repairs, drying products and complex patterns can extend the programme considerably. Acclimatisation and adhesive curing are separate from active fitting time; ask when furniture and foot traffic can safely return.
Clear furniture and agree responsibility for heavy items, appliances and temporary storage. Keep access to other rooms in mind if the hallway is being laid. At handover, check thresholds, trims and door operation, and retain the product care instructions. Use the recommended cleaning method and protect the new finish when moving furniture back.
Frequently asked questions
- Is laminate cheaper to fit than engineered wood?
- Usually for comparable simple rooms, but extensive preparation can outweigh the difference in laying rates. Compare complete installed scopes, not just the product or labour rate.
- Can a new floor go over existing boards?
- Sometimes, if they are sound and meet the new product’s requirements. Movement, moisture and levels must be checked, and preparation or overlay may be necessary.
- Does engineered flooring work with underfloor heating?
- Many products do, but approval is product-specific. Obtain written compatibility information and follow the specified installation, commissioning and operating limits.
- Should flooring be fitted before wardrobes?
- Agree the sequence with both installers. Fixed cabinetry can restrict movement in floating floors, so the flooring manufacturer’s instructions should determine the detail.
- Will the fitting price include moving furniture?
- Not unless stated. Ask about moving, storing and replacing furniture before accepting the quote, including any limits on heavy or fragile items.
