Carpentry runs through almost every building job, from the timber frame of a new roof to the last strip of skirting board. Yet many homeowners are not sure what to ask a carpenter for, or the difference between first fix and second fix. This guide explains the common jobs, how the two stages fit into a project, and when a professional is worth it.

First fix vs second fix
First fix is the structural and hidden carpentry done before plastering. It includes floor joists, roof timbers, stud walls, door linings and frames, window boards, noggins for fixing heavy items like radiators or wall units, and boxing in for pipes. It needs to be accurate, because everything that follows is fixed to it.
Second fix is the visible, finishing carpentry done after plastering: hanging doors, fitting skirting and architrave, handrails and spindles, door furniture, built-in storage and other trim. It is where neat joints and careful finishing show.
On an extension, conversion or refurbishment, the carpenter usually visits twice: once for first fix while the electrician and plumber run their first fix, and again after the plaster has dried.
Internal doors
Hanging a door well means trimming it to suit a frame that may not be square, cutting in hinges and the latch, and leaving even gaps all round. Fire doors, for example in loft conversions or between an integral garage and the house, need the correct frames, hinges and closers to do their job. A badly hung door sticks, swings open or lets light through; a good one simply works for years.
Skirting boards and architrave
Skirting and architrave hide the joint between walls, floors and door frames and protect the plaster from knocks. Good results depend on tight mitres and scribed joints where walls are not straight, which is common in older houses. Matching period mouldings when only part of a room is being replaced is a job worth leaving to an experienced carpenter.
Flooring
Carpenters lay and repair timber floors, including replacing damaged joists, fitting tongue and groove chipboard or plywood decking, and laying engineered or solid wood floors. Squeaky floors are often caused by loose boards or joists that can be re-fixed. Getting the subfloor flat and solid is what makes a finished floor last.
Stud walls
A timber stud wall is the usual way to divide a room, create an en-suite or build a cupboard. The frame is fixed to the floor, ceiling and walls, with noggins added where shelves, a TV or a basin will hang. Adding acoustic insulation between the studs makes a big difference to sound between bedrooms.
Built-in wardrobes and bespoke storage
Fitted wardrobes and alcove units make the most of awkward spaces such as sloping ceilings, chimney recesses and under-stairs areas, where off-the-shelf furniture never quite fits. Bespoke joinery is built to the exact measurements of the room and can be painted to match. We also make staircases, handrails, integrated storage and cabinetry.
Pitched roof timber work
Pitched roofs on extensions, dormers and loft conversions are often cut and assembled on site from rafters, ridge boards, purlins and ceiling joists, or built using manufactured trusses. Cut roofs take skill to set out so the pitch and lines are true, particularly where a new roof joins an existing one. Roof carpentry is structural and is checked by building control.
When should you hire a carpenter?
- Any structural timber work: joists, roofs, stud walls carrying loads.
- Fire doors and work that has to meet building regulations.
- When appearance matters: doors, skirting, staircases and joinery on show.
- Older houses where nothing is square and pieces need scribing to fit.
- As part of a bigger project, where first and second fix need to be coordinated with other trades.
Frequently asked questions
- Do you take on small carpentry jobs?
- Get in touch with details of the job and we will let you know if we can help.
- Should flooring go down before or after skirting?
- It depends on the floor. Many fitters lay timber floors first and fit skirting over the expansion gap; the carpenter will advise for your floor type.
