Building regulations set technical standards for building work in England. They deal with matters such as structural stability, fire safety, energy performance, ventilation and drainage. They are separate from planning permission: an extension can be permitted development for planning purposes and still require building regulations approval before it is built.
For homeowners, the practical aim is to agree a compliant design, arrange the right inspections and obtain the completion evidence. Leaving these matters until the final week risks concealed work needing to be exposed. This guide explains how to organise the process for ordinary domestic work, rather than higher-risk building projects, which follow different procedures.

Which home projects normally need approval?
Extensions, loft conversions and garage conversions normally require approval. So do many structural alterations, including removing a load-bearing wall, forming a new opening or altering roof timbers. Significant changes to drainage, new bathrooms in different locations and some changes of use can also bring work within the regulations.
Replacement windows, replacement heating appliances, electrical alterations and the renovation of thermal elements can be controlled work even without an extension. A project that looks cosmetic can cross into regulated work when substantial plaster or roof coverings are stripped away, or when the layout changes the escape route.
Tell building control exactly what is proposed, including connected work elsewhere in the house. A new kitchen layout might involve drainage, ventilation, electrics and a structural opening, although replacing units alone would not normally require an application. Dividing the work into separate trade packages does not remove the underlying requirements.
The owner and those carrying out or designing work have legal responsibilities. Current dutyholder requirements mean competence, coordination and clear information matter from the outset. Ask who will act as principal designer and principal contractor where those appointments are required; these building regulations roles are distinct from similarly named construction health and safety roles.
The Approved Documents that matter in a house
The regulations contain functional requirements. Approved Documents provide practical guidance on ways of meeting them; they are not a substitute for project-specific design. An alternative solution may be acceptable if compliance is demonstrated. Use the edition and transitional provisions applicable to your project, rather than assuming an old drawing remains current.
Part A covers structure, including foundations, beams and floor loading. Part B addresses fire safety: escape routes, fire resistance, alarms and related details. Part C concerns site preparation and resistance to contaminants and moisture. Part E covers resistance to sound, particularly relevant to separating constructions and some internal walls and floors.
Part F concerns ventilation, while Part L addresses conservation of fuel and power. Insulation, glazing, airtightness and heating choices must work together. Better airtightness without suitable ventilation can create condensation problems, including in exposed coastal homes. Part O concerns overheating in new residential buildings; it does not automatically apply to an ordinary extension.
Part G covers sanitation, hot water safety and water efficiency; Part H covers drainage and waste disposal. Part J addresses combustion appliances and fuel storage. Part K covers protection from falling, collision and impact, including stairs and guarding. Part M concerns access to and use of buildings, and Part P concerns electrical safety in dwellings. The relevant provisions depend on the work, not simply the building’s age.
Full plans: resolving the design before construction
For ordinary domestic projects, a full plans application gives the building control body detailed drawings and supporting information to assess. These may include structural calculations, drainage layouts, insulation build-ups, fire precautions and ventilation specifications. It is often useful for extensions, conversions and structural work where several technical elements interact.
Plans can be approved, approved subject to conditions where appropriate, or rejected with reasons. The normal decision period is five weeks, extendable to two months by agreement. An approval is not permission to omit inspections, substitute materials without checking or ignore conditions. Discuss changes before they are built.
A plans assessment can identify an inadequate stair arrangement or a missing structural detail while revisions remain relatively straightforward. It does not remove the designer’s responsibility or guarantee workmanship. Building control checks compliance; it is not providing continuous supervision or a full quality inspection service on your behalf.
Building notices and regularisation are different routes
A building notice can suit some straightforward domestic work because detailed plans are not normally assessed and formally approved in advance. The local authority may still require calculations and other information. Work can generally begin after the required two-day notice period, but agree inspection arrangements before starting. Some projects are not eligible for this route.
The risk is that a compliance problem emerges on site after materials have been ordered or work completed. A building notice is therefore not a shortcut around design. For complicated structural alterations or a tight loft staircase, a full plans assessment may offer a more useful opportunity to resolve details early.
Regularisation is a retrospective local authority process for certain unauthorised work carried out on or after 11 November 1985. It is not available through a private building control approver. The authority may require opening up, testing, further information and remedial work before it can issue a regularisation certificate.
Do not assume a house purchase, old invoice or lack of complaints establishes compliance. If approval records are missing, ask the council what is held before choosing a remedy. Where a sale is involved, discuss options with your conveyancer before contacting authorities, because doing so can affect the availability of indemnity insurance.
Local authority or registered building control approver?
For ordinary domestic work, you can normally choose local authority building control or a private registered building control approver. The old description approved inspector is still widely used, but the current regulated role is registered building control approver. Check the provider’s registration and suitability for your project.
A private approver uses an initial notice procedure with the local authority rather than a local authority full plans application or building notice. It reviews plans and inspects work, with a final certificate at completion when satisfied. Agree who submits the initial notice and ensure the necessary procedure is in place before starting.
Compare the actual service: plan checking, inspection arrangements, named contacts, charges and treatment of design changes. Neither route replaces a structural engineer, architect or competent contractor. Local authorities retain enforcement functions, and unresolved compliance problems on a private route may lead to the work reverting to local authority control.
For projects in Arun, Chichester or the Adur & Worthing area, confirm which local authority service covers the address. The planning authority and building control provider need not be the same organisation. Keep their reference numbers separate so that a planning approval is never mistaken for technical approval.
Book inspections before work is covered up
Agree a project-specific inspection schedule. Typical stages include foundation excavations before concrete, foundations and oversite construction, damp-proofing, drainage before backfilling, structural members before concealment, insulation and fire-stopping, and completion. Not every project has every stage, and the building control body decides what it needs to see.
The builder should give the required notices and book visits in good time. Establish who is responsible for this in writing. A missed inspection can lead to additional evidence being required or finished work being opened up. Photographs are useful records but do not automatically replace an inspection.
Current procedures include formal notifications concerning commencement and completion, alongside stage inspections. Ask your provider what information, declarations and notice periods apply. Do not assume a first site visit means every administrative requirement has been met.
Keep the latest drawings, calculations, product information and approved changes accessible on site. If foundations need to change because of ground conditions, pause and agree the revised design with the engineer and building control. An inspector’s visit is not a substitute for a designed solution.
Competent person schemes and work that may be exempt
An appropriately registered installer can self-certify specified work through an authorised competent person scheme. Examples include certain replacement window installations and some electrical or heating work. Check the installer’s scheme scope for the actual job, rather than assuming any trade membership permits self-certification.
Part P applies to domestic electrical work, although not every alteration is notifiable. New circuits, consumer unit replacement and certain work in special locations are generally notifiable. A registered installer can deal with the notification where authorised. Keep electrical test certification as well as the building regulations compliance certificate.
Gas work must be carried out by a Gas Safe registered engineer qualified for the appliance and work involved. Relevant installations may also require building regulations notification. Window scheme certification does not cover every structural change around a window, such as enlarging an opening or introducing a new beam.
Decoration, ordinary like-for-like kitchen units and many minor repairs do not normally require approval. Some small detached buildings, porches and conservatories can be exempt, but only if all relevant conditions are met. Size alone is not enough: use, boundary distance, construction, retained separation and electrical work may affect the position. Ask before relying on an exemption.
Completion evidence protects your future sale
At the end, request the local authority completion certificate or the registered approver’s final certificate, as applicable. Supply outstanding test results, commissioning records and dutyholder declarations promptly. A final visit is not necessarily the same as the certificate having been issued.
When selling or remortgaging, conveyancers and lenders commonly ask for evidence covering extensions, conversions and other controlled work. Missing paperwork can delay enquiries or trigger requests for further investigation. A certificate is evidence about regulatory compliance, not a warranty against every defect or proof that planning conditions were discharged.
Keep a single property folder containing drawings, calculations, approval references, completion documentation and installer certificates. FirstR8 Builds can work from your own plans or with experienced local architects. Discuss the building control route during the free, no-obligation initial site consultation so responsibilities are clear before the detailed quote and construction programme are agreed.
Frequently asked questions
- Can I start as soon as planning permission arrives?
- Not necessarily. Arrange the separate building control process, required notices and any other consents first. Check planning conditions that must be discharged before starting.
- Does every replacement window need a council application?
- No. An authorised competent person installer can often self-certify qualifying work. Other routes are available, but you should agree the compliance route before installation.
- Will an inspector check the builder every day?
- No. Inspections take place at selected stages. They do not replace competent construction, contractual supervision or your own arrangements for checking workmanship.
- Can old unauthorised work always be regularised?
- No. Eligibility, available evidence and the standard of the work matter. Opening up and remedial work may be necessary before the council can issue a certificate.
- Should I keep certificates after selling?
- Give the buyer the required records through your conveyancer and retain copies. Keep digital backups while you own the property so documents remain available when needed.