Foundations spread the weight of an extension into ground that can support it without unacceptable movement. Choosing them is not simply a matter of copying the house next door: soil, trees, drains, groundwater and the existing building all influence the design. Most of this work disappears underground, but mistakes can affect everything built above it.

For homeowners in West Sussex, the starting point is understanding what is beneath the particular plot, rather than assuming all coastal or Downs locations behave alike. This guide explains the main foundation options, what investigations can reveal, and the decisions to settle before concrete arrives. The final design needs to suit the site and satisfy building control.

House extension work by FirstR8 Builds in West Sussex

Strip and trench fill: the usual starting points

Strip foundations use a continuous concrete strip beneath load-bearing walls, with masonry built up from it. They are commonly suitable where firm, reasonably consistent bearing ground is accessible and the required width and depth are practical. The strip spreads the wall load; its dimensions depend on ground strength and the loads it carries.

Trench fill foundations put considerably more concrete into the excavation, bringing it closer to ground level and reducing the amount of below-ground masonry. They can simplify construction, but use more concrete and still need suitable bearing ground. They are not a way to avoid investigating weak soil, tree influence or nearby drains.

Neither option is automatically right for a single-storey extension. A wide opening, heavy wall construction or concentrated steel support can change the foundation requirements. The designer should consider those loads alongside the ground, rather than selecting a standard trench size from the footprint alone.

When raft foundations or piles may be needed

A raft is a reinforced concrete foundation extending across much or all of the building footprint. It spreads loads over a larger area and can help manage some variable ground conditions. However, it must be designed for the site: very soft soil, substantial ground movement or problematic fill may make a raft unsuitable without further measures.

Piled foundations transfer loads down to more suitable material through individual piles. Reinforced ground beams commonly connect the piles and support the walls. Mini piles can be useful on restricted extension sites because smaller equipment may reach places that larger piling rigs cannot. Access, headroom, vibration, spoil and neighbouring structures still need checking.

These systems usually involve specialist design and installation, and sometimes testing. They may also need measures to protect beams and suspended floors from ground swelling. A piled extension beside a house on shallow foundations needs particular attention to how the two structures meet, because they may move differently.

What West Sussex ground conditions can mean

Clay can shrink as it dries and swell as moisture returns. Foundation design must account for that movement, particularly near trees. Around 1 metre is a commonly quoted typical minimum depth on shrinkable clay, but it is not a site-specific prescription: soil properties, vegetation and other conditions can require substantially deeper foundations or a different solution.

Chalk occurs on and around the South Downs, including the Findon area. Sound chalk can provide good support, but weathered chalk, solution features and variable layers need assessment. Finding pale material in a trial hole does not establish its condition or bearing capacity. Sloping sites may also need stepped foundations and careful excavation sequencing.

Along the coastal strip, sandy or gravelly soils may drain freely and provide suitable support when dense, but loose deposits can behave differently. A high water table can make trenches unstable and complicate excavation and concreting. Conditions can change over a short distance, so a nearby successful extension is useful background, not proof.

Made ground means ground altered or placed by people, such as filled excavations, demolition material or older landscaping. Its depth and composition may vary unexpectedly. It should not be assumed suitable to support an extension; investigation may identify a need to dig through it, assess contamination or use an engineered foundation system.

Why trees and clay can mean deeper foundations

Tree roots draw moisture from soil. In shrinkable clay, that drying can cause the ground to contract, sometimes well below the surface. A foundation within the affected zone can move as conditions change. Going deeper may place its base below significant seasonal moisture changes, but the required approach depends on the clay and the vegetation.

The relevant factors include tree species, likely mature size, distance from the extension and the clay’s shrinkability. Hedges and neighbouring trees can matter too. A structural engineer may use recognised guidance alongside ground information to determine depth and any heave precautions. Tree influence is not limited to roots visibly crossing the excavation.

Removing a tree is not necessarily a shortcut. Previously dried clay can slowly take up water and swell after removal, a process called heave. Tell the designer about recently removed trees as well as existing ones, and check permissions or protections before any tree work. Do not cut substantial roots without appropriate advice.

Trial holes and the connection to the existing house

Trial holes expose limited areas of ground and can reveal the existing footing’s depth, width and condition. They help the designer understand the relationship between old and new work. Where uncertainty remains, a ground investigation with boreholes, sampling or testing may be needed; a single hole cannot establish conditions across every part of the site.

Matching the existing house does not always mean using exactly the same depth. The aim is a compatible, properly designed relationship that avoids undermining old footings and limits harmful differential movement. An older house may have shallow foundations that would not be an appropriate model for new construction under current site conditions.

Excavation alongside existing walls must be planned carefully. Digging below nearby footings can remove their support, so short sequenced sections, revised details or other engineered measures may be necessary. Trial holes themselves should be arranged safely, not dug casually against a wall. Nearby neighbouring foundations may also trigger Party Wall etc. Act 1996 procedures.

Drains, Southern Water and build-over agreements

Check drainage records early, then establish the actual routes, depths and condition of drains that could conflict with the extension. Records are a starting point rather than a guarantee of exact positions. A drainage survey may be useful, especially where chambers, shared connections or unexplained pipe runs suggest the layout is more complicated.

Southern Water is the relevant sewerage undertaker across much of this area. If work is over or within 3 metres of a public sewer, check its current build-over requirements before finalising the foundations. Some shared pipes within private gardens are public sewers. Eligibility and approval depend on the sewer and proposed work; not every arrangement can be accepted.

A build-over agreement, where required, is separate from planning permission and building regulations approval. Foundations must avoid loading or damaging pipes and preserve appropriate access for maintenance. Engineered bridging details, drainage alterations or relocation of inspection chambers may be necessary. An inaccessible chamber beneath a new room is not something to resolve after the slab is poured.

Inspection and safe excavation before concrete

Agree the inspection stages with building control before starting. Foundation excavations normally need inspection before concrete is placed, so the bearing material, depth and relationship to nearby features can be checked. Arrange the visit with enough notice and keep the designer available if unexpected conditions require revised details. An inspection does not replace the structural design.

Trenches can collapse, particularly in loose or wet ground. The contractor must plan safe excavation, support where necessary and safe working arrangements; homeowners should stay outside the excavation area. Rain, groundwater and unsupported trench sides can change conditions quickly, even after a trench initially appears sound.

Do not pour onto loose spoil, softened ground or standing water without the appropriate technical assessment and preparation. If inspection reveals unsuitable material, further excavation or redesign may be needed. Record the agreed foundation details and relevant inspection outcomes, and keep any concrete and specialist installation records with the project documents.

How foundations change cost, programme and risk

Straightforward shallow foundations generally involve fewer specialist operations than piles, but depth alone does not determine the bill. Excavated volume, disposal, restricted access, concrete delivery, reinforcement and groundwater management all matter. Trench fill can reduce masonry labour while increasing concrete use. Compare the complete proposed system, not just a concrete quantity.

The programme needs room for investigations, design decisions, sewer approvals where applicable, inspections and safe excavation. Piling brings specialist scheduling and follow-on beam construction. Wet weather or unexpected fill can interrupt work, while concrete must gain sufficient strength before subsequent loading. Agree realistic sequencing rather than assuming the walls can start immediately after a pour.

Common failures include building on disturbed ground, missing tree influence, damaging drains, undermining existing footings and changing foundation details without design input. Consequences can include cracking, uneven movement, water ingress and expensive remedial work. A contingency for genuine below-ground uncertainty is sensible, alongside a clear process for pricing and approving changes.

FirstR8 Builds offers a free, no-obligation initial site consultation and then a detailed quote, working with experienced local architects or from your own plans. Before agreeing the groundwork scope, establish what investigation and design information is available, what the quote assumes, and how unforeseen ground conditions will be handled.

Frequently asked questions

How deep should extension foundations be?
There is no universal depth. Around 1 metre is a commonly quoted typical minimum on shrinkable clay, but trees, ground conditions, loads and nearby structures can require deeper or alternative foundations. Your designer and building control should assess the actual site.
Can a two-storey extension use strip foundations?
Yes, where the ground and structural design allow it. Two storeys do not automatically mean piles. Equally, a lightweight single-storey extension can need specialist foundations on difficult ground. Design loads and site conditions determine the answer.
Can I reuse conservatory foundations for an extension?
Do not assume so. Their dimensions, condition and bearing ground need investigation against the proposed loads. Existing paperwork may help, but exposure and engineering assessment may still be necessary before reuse is accepted.
Do I need Southern Water permission for a private drain?
A genuinely private drain is different from a public sewer, but ownership is not obvious from its location. Check the status and Southern Water’s requirements. Drainage alterations still need to meet building regulations, even where a build-over agreement is not required.
What happens if poor ground is found during digging?
Work on the affected foundations should pause while the designer and building control review it. Additional investigation, deeper excavation or another foundation system may be needed. Agree the revised design, cost and programme before proceeding, rather than improvising on site.

Talk to us about your project

Book your free, no-obligation initial site consultation. We cover Bognor Regis, Littlehampton, Chichester, Worthing, East Preston, Findon, Rustington.

07346 814853

Unit B, Lelliot and Co, Ash Grove / Heath Place, Bognor Regis PO22 9SL · Monday to Friday, 8am – 7pm