A kitchen extension combines two projects in one: building new floor space and fitting a working kitchen inside it. That is why two kitchen extensions of a similar size can end up priced very differently. The building shell, the opening into the existing house, the glazing, the drainage and the kitchen itself all pull the figure in different directions.
This guide does not give prices. Instead it explains each factor that moves the cost, so you can understand a quote, decide where to spend and where to save, and avoid surprises. The only reliable figure for your home comes from a site visit and an itemised quote. FirstR8 Builds offers a free, no-obligation initial site consultation and provides fully transparent, itemised quotes.

In short: what drives the cost
If you only read one section, read this. The biggest influences on the price of a kitchen extension are usually the following, roughly in the order homeowners notice them:
- The size and shape of the new space, and whether it is single or double storey.
- What is under the ground: soil type, nearby trees and drains that affect the foundations.
- How much of the existing back or side wall comes out, and the steel beams needed to carry the load.
- The roof: flat or pitched, and whether you add rooflights or a roof lantern.
- Glazing: large sliding or bi-fold doors are often one of the biggest single items.
- Moving water, waste, gas and electrics to a new kitchen position.
- The kitchen specification: units, worktops, appliances and extraction.
- Floor finishes, underfloor heating, lighting and decoration.
- Professional fees and approvals: design, structural engineering, building control and, where relevant, planning and party wall matters.
Size, shape and layout
Floor area matters, but shape matters too. A simple rectangle off the back of the house uses straightforward foundations, walls and a single roof. An L-shaped wraparound that fills a side return and runs across the rear involves more corners, more complex roof junctions and often more structural work where it meets the existing house. Every extra corner and junction adds labour and detailing.
Think about how the new kitchen will actually be used before fixing the size. A long run of units with an island needs a certain width to work comfortably. Squeezing a kitchen into an extension that is slightly too narrow can mean a second round of changes later, which is far more expensive than getting the footprint right at drawing stage. A designer or architect can test layouts on paper before anything is built.
Single-storey kitchen extensions are the most common, but some homeowners add a bedroom above. A two-storey extension usually costs more overall but shares one set of foundations and one roof between two floors, so it can make sense if you need the space upstairs as well.
Foundations and what is in the ground
Nobody can see below ground before digging, and this is where costs can change. Clay soils, trees close to the footprint, made-up ground and high water tables can all lead to deeper or specialist foundations. Building control will inspect the excavations before concrete goes in, and if the ground is not suitable at the planned depth, the foundation design may need to change.
Drains are a common factor at the back of a house. If a shared or public sewer runs under the footprint, the water company may need to agree to the work, and the drain may need protecting or diverting. Your existing kitchen waste and any rainwater pipes will also need reconnecting to suit the new layout. A drainage survey or a careful look at the manholes during the site visit helps flag these issues early.
Ask any builder how ground conditions are allowed for in their quote, and whether there is a provisional sum for foundations that may go deeper than expected.
Opening up the existing house: steel beams and structure
Most kitchen extensions only feel worthwhile if the old and new spaces join into one open room. That means removing part or all of the external wall, and often an internal wall between the old kitchen and dining room as well. The load from the floors, walls and roof above has to be carried by new steel beams sitting on padstones, with temporary propping while the wall comes out.
A structural engineer calculates the beam sizes and supports, and building control checks the work. The wider the opening and the more load above it, the bigger the steel and the more involved the work. Hiding a beam within the ceiling for a flush finish usually takes more work than leaving a downstand. Chimney breasts, bay windows and previous alterations can also complicate the structure.
FirstR8 Builds carries out structural alterations, including steel beam installation and the removal of load-bearing walls, working to your structural engineer's design. Our guide to knocking through walls explains the process in more detail.
Roof, rooflights and glazing
Kitchens benefit from daylight, and that light usually comes through the roof and the back wall. A flat roof is generally simpler to build than a pitched roof finished to match the house, though planning considerations and the look you want may favour one or the other. Roof lanterns and rooflights brighten the middle of a deep room but add structural framing, flashing and the cost of the glazing units themselves.
Large sliding or bi-fold doors are often among the most expensive items in the whole project. The size, the frame material, the glass specification and the number of panels all affect the price, and wide openings in the rear wall may need their own steel above. Building Regulations also set requirements for energy efficiency, which can affect how much glazing you can have without balancing it elsewhere, so this is worth discussing with your designer early.
Services: water, waste, gas, electrics and extraction
Where the sink, hob and appliances go has a direct effect on cost. Keeping the sink close to an existing drain is usually simpler. Putting a sink in an island means running waste and water through the floor, which needs planning before the slab is laid. Moving a gas hob or boiler involves a Gas Safe registered engineer, and a new kitchen normally needs new electrical circuits, sockets and lighting installed and certified by a qualified electrician.
Extraction is easy to overlook. A cooker hood needs a route to the outside, and a recirculating hood or a downdraft extractor in an island has its own requirements. Underfloor heating is popular in kitchen extensions because it frees up wall space for units, but it affects the floor build-up, the heating system and the programme.
The kitchen itself
The kitchen can be a large share of the overall spend, and the range is enormous. Unit construction, door finish, worktop material, the number of tall units and drawers, built-in appliances and any bespoke cabinetry all move the figure. Stone or composite worktops are templated after the units are fitted, which adds a short wait into the programme.
Be clear in every quote whether the kitchen is supplied by you, supplied by the builder or bought from a kitchen company with fitting included. FirstR8 Builds carries out complete kitchen installations, including plumbing, tiling and bespoke cabinetry, so the build and the fit can be managed together. Our kitchen installation guide covers who does what during the fit and the common problems to avoid.
Fees, approvals and other costs people forget
A building quote rarely covers everything. Budget separately for items that sit outside the construction work, and check with each builder which of these they include:
- Architect or designer drawings, and any planning application if the extension is not permitted development.
- Structural engineer's calculations for the foundations and steel beams.
- Building control fees, which apply to extensions whether or not planning permission is needed.
- Party wall matters if you are building on or near a shared boundary.
- Flooring, decoration, lighting fittings and blinds.
- Temporary living arrangements, such as a makeshift kitchen elsewhere in the house.
- A contingency for things that only appear once work starts.
Access, site and timing
How easily materials and waste can get to and from the back of the house affects labour time. A wide driveway with side access is very different from a mid-terrace with everything carried through the house. Skip placement, parking and neighbours' access all play a part.
The time of year can matter too. Groundwork and roofing are more weather dependent than internal work, so the programme should allow for that. FirstR8 Builds sets realistic timelines before work begins and keeps them on track with regular updates.
How to compare kitchen extension quotes fairly
The lowest figure is not always the cheapest outcome. Quotes often differ because they include different things. To compare like with like:
- Give every builder the same drawings, structural calculations and specification.
- Ask for an itemised quote, not a single total, so you can see groundwork, structure, roof, glazing, services and finishes separately.
- Check what is excluded: kitchen supply, flooring, decoration, fees and VAT.
- Ask how unknowns such as foundations and drains are handled.
- Ask how the work will be sequenced and how long each stage should take.
Frequently asked questions
- What is the biggest factor in the cost of a kitchen extension?
- It varies by house, but the size of the extension, the structural work to open up the existing wall, the glazing and the kitchen specification are usually the largest parts of the cost. Ground conditions can also make a big difference once digging starts.
- Do I need planning permission for a kitchen extension?
- Some single-storey rear extensions fall under permitted development, while others need a planning application. Homes in conservation areas or the South Downs National Park often have fewer permitted development rights. Building Regulations approval is needed either way. Our planning permission vs permitted development guide explains the difference.
- Can you work from my architect's plans?
- Yes. FirstR8 Builds works strictly to your architectural plans and building regulations. If you do not have plans yet, we can introduce you to our network of trusted architects.
- Can you fit the kitchen as well as build the extension?
- Yes. We carry out complete kitchen installations, including plumbing, tiling and bespoke cabinetry, as well as the extension build itself.
- How do I get an accurate price?
- Book a free, no-obligation initial site consultation. After seeing the house and your plans, we provide a fully transparent, itemised quote. We cover Bognor Regis, Littlehampton, Chichester, Worthing, East Preston, Findon and Rustington.