When people choose a new floor they think about colour and texture. Floor fitters think about what is underneath. The subfloor, whether timber boards on joists or a concrete slab, decides whether a new floor stays flat, quiet and tight for years or starts creaking, gapping and cracking within months.
This guide explains what subfloor preparation involves, the common problems found when old flooring comes up and how they are dealt with. FirstR8 Builds lays flooring as part of its carpentry and refurbishment work and offers a free, no-obligation initial site consultation.

In short
Any new floor needs a subfloor that is sound, flat, dry and clean. Timber subfloors may need loose boards refixed, squeaks cured or a plywood overlay. Concrete subfloors may need moisture testing, a damp-proof membrane and levelling compound. Skipping these steps is the most common reason a new floor fails.
The two main types of subfloor
Most houses have suspended timber floors upstairs and either suspended timber or solid concrete downstairs. Older homes often have timber ground floors over a ventilated void; many newer homes and almost all extensions have concrete slabs or screeds. Each needs different preparation, and some houses have both, which is common where an extension joins an older house.
Preparing a timber subfloor
When the old covering comes up, the carpenter checks the boards and joists underneath.
- Loose or squeaking boards are screwed down to the joists, avoiding pipes and cables.
- Damaged or rotten boards are replaced, and the cause of any rot is investigated.
- Humps and dips are checked with a long straight edge.
- Where the surface is uneven or the new floor needs a smooth base, plywood or hardboard may be fixed over the top.
- Gaps and holes left by old pipes are filled or boarded.
When the joists are the problem
Sometimes the boards are fine but the floor still bounces or sags. That usually points to the joists: notched too deeply for pipes, undersized, weakened by rot or woodworm, or overloaded. This needs fixing before new flooring, sometimes by adding noggins, doubling up joists or other repairs. Structural issues should be assessed properly, and a structural engineer may be needed. Our guide to sagging floors and floor joist repairs covers this in more detail.
Preparing a concrete subfloor
Concrete must be dry enough for the flooring chosen. New screeds take a long time to dry, and older slabs may have no damp-proof membrane. Moisture testing tells the fitter whether to wait, add a liquid or sheet membrane, or choose a different product.
Concrete also needs to be flat. Small dips and ridges telegraph through vinyl and click flooring, and can cause wood floors to rock. Self-levelling compound is often used to give a smooth, flat surface. The concrete should also be clean and free of old adhesive that could stop new adhesive bonding.
Different floors, different tolerances
Each type of floor has its own needs, which is why manufacturers' instructions matter:
- Sheet vinyl and LVT need a very smooth surface because every bump shows.
- Laminate and click flooring tolerate some unevenness but not humps that cause flexing.
- Engineered and solid wood need dry, stable conditions and the right fixing base.
- Tiles need a rigid, stable base; bouncing timber floors can crack tiles and grout.
- Carpet is the most forgiving, but squeaks under carpet are still annoying.
Door heights and thresholds
New flooring plus a plywood overlay or levelling compound can raise the floor. Doors may need trimming, and thresholds between rooms need planning so that there are no trip hazards. In extensions, the new floor level is often designed to meet the old house level, so it is worth discussing finished floor heights early.
Underfloor heating
Underfloor heating is usually laid in or on the subfloor before the finished floor, so the order of trades matters. Heated screeds need commissioning and drying following guidance before timber goes down. Check that your chosen flooring is suitable for underfloor heating.
What affects the cost and time
Preparation costs vary because nobody knows exactly what is under an old floor until it is lifted. Factors include the size of the room, removal of old coverings and adhesive, repairs to boards or joists, moisture treatment, the amount of levelling compound, drying times and any door trimming. A sensible quote explains what is included and how unforeseen problems will be handled.
Mistakes to avoid
Avoid laying new floors over old ones without checking, assuming new concrete is dry, using filler instead of fixing loose boards, and ignoring bounce. Do not forget pipes and cables when screwing boards down. A few extra hours of preparation usually saves a floor.
Frequently asked questions
- Can I lay new flooring over old floor tiles?
- Sometimes, if the tiles are well bonded, flat and suitable for the new floor. Loose or uneven tiles should come up first. Check the manufacturer's guidance.
- How do you stop floorboards squeaking?
- Usually by screwing loose boards firmly to the joists. Persistent squeaks may mean joist problems that need investigating.
- How long does a new screed take to dry?
- It depends on the screed type, thickness and conditions. It can take many weeks, so moisture testing is used before laying timber or vinyl.
- What is self-levelling compound?
- A pourable compound that spreads to form a smooth, flat surface over concrete or suitable timber subfloors before new flooring.
- Will new flooring mean trimming my doors?