You do not generally have to appoint an architect simply because you want to extend or alter your home. You do need a design that suits your household, can be built safely and addresses the relevant approvals. Choosing who prepares that design is about competence, scope and responsibility, not just a professional label.
Architects, architectural technologists, technicians, structural engineers and design-and-build businesses can all contribute, but they do not necessarily offer the same service. This guide explains what to ask, what drawings achieve and how to avoid paying for a planning package while assuming it includes all the information needed to build.

Architect is a protected title, not a compulsory appointment
In the UK, the title architect is protected by law. Someone offering services under that title should be registered with the Architects Registration Board, usually shortened to ARB. You can check the register. RIBA membership is separate: an architect does not have to be a RIBA member simply to be registered or use the protected title.
An architect may help develop the brief, explore layout options, prepare applications and coordinate technical design. Some also manage tendering and administer a building contract during construction. Those later services are not automatically included because you paid for early drawings. Ask for a written appointment describing exactly what will be done and at which stages.
An architect can be particularly useful where the layout is difficult, the design ambition is high or a sensitive setting demands careful explanation. That does not mean every small project needs a large design team. Look for relevant domestic experience, clear communication and an approach proportionate to your project rather than choosing on title alone.
Technologists, technicians and design-and-build teams
Architectural technologists often focus on how buildings are technically designed and assembled, though their services can also include concept design and planning. A Chartered Architectural Technologist may use the designation MCIAT; check professional status with the relevant institute where it is claimed. The service should still be defined in writing, including any limits or specialist work excluded.
Architectural technicians and other building designers may prepare useful survey, planning or technical information. Titles alone do not establish competence for your particular project. Ask to see comparable work, discuss knowledge of local requirements and confirm professional indemnity insurance and how design errors or changes would be handled.
A design-and-build arrangement brings design and construction under an agreed commercial structure. It can simplify some coordination, but only if responsibility is clear. Establish who employs the designers, who checks the design, what you receive for the price and what happens if you choose not to proceed with construction. Do not assume every builder offering advice is providing a complete professional design service.
What the structural engineer contributes
A structural engineer designs and checks load-bearing elements such as beams, posts, foundations and roof alterations. Their calculations help show how loads are safely transferred to the ground. The engineer may also advise on existing structures and investigate specific concerns. This role is different from planning the overall appearance and everyday layout of your home.
An extension with a large opening into the existing house may need close coordination between the designer and engineer. Beam depth affects ceiling lines, supports affect room layouts, and foundations affect drainage and floor construction. Commissioning calculations after every architectural choice is fixed can lead to avoidable redesign.
Agree who coordinates structural information into the drawings the builder will use. A calculation package is not necessarily a complete set of installation instructions, and permanent structural design does not automatically include temporary works. Responsibilities for sequencing, propping and temporary stability should be explicitly addressed before a load-bearing wall or roof is disturbed.
RIBA stages in straightforward homeowner language
The RIBA Plan of Work describes a project from its first purpose through to occupation. It is a useful shared framework, not a requirement to buy every service from an architect. A small home project may combine activities, but the underlying questions still need answering. The stage labels do not replace a proper appointment or define an agreed fee by themselves.
Stages 0 and 1 establish whether building is the right response, what you need and what budget and site information are available. Stage 2 develops the concept: the broad layout and design approach. Stage 3 brings the design into better coordination, commonly supporting the planning submission, although application timing varies.
Stage 4 develops technical information so the project can be constructed. Stage 5 covers manufacturing and construction, with design queries and inspections as agreed. Stage 6 addresses handover, and Stage 7 concerns the building in use. Ask which outputs you will receive at each point and who remains involved when construction begins.
- Early stages: agree the brief and test feasible options.
- Design stages: coordinate layout, structure, services and approvals.
- Construction and handover: resolve queries, check agreed matters and record completion.
Measured surveys and information about the existing house
A measured survey records the existing building so the design starts from reliable dimensions. Depending on the commission, it may include floor plans, elevations, sections, levels and relevant site features. Old estate agency plans are useful orientation aids but are not a substitute for a measured record suitable for design.
Tell the surveyor about roof spaces, outbuildings, level changes and access limitations. Ask what is included and how concealed areas will be treated. A measured survey is not automatically a structural condition survey, drainage survey, asbestos survey or boundary determination. Those answer different questions and may need separate appointments.
Existing records, previous approvals and drainage information can save uncertainty, but should be checked rather than copied without review. Where dimensions or construction cannot be confirmed until opening up, the drawings should make that limitation clear. An early investigation can be cheaper than discovering during construction that a key assumption was wrong.
Planning drawings are not building regulations drawings
Planning drawings primarily explain what you propose: its size, appearance, siting and relationship to the surroundings. They support the planning decision or other relevant application. They do not normally resolve every construction junction, material performance requirement or structural connection. Permission to build a shape is not confirmation of all its technical details.
Building regulations information addresses matters such as structure, fire safety, insulation, ventilation and drainage. It may include specifications, sections and calculations from other specialists. A technical package should be coordinated with the actual design and applicable regulations. Building control review does not turn incomplete information into a fully detailed construction package.
Construction information may go further, setting out junctions, finishes, schedules and dimensions needed for consistent pricing and delivery. Ask whether the proposed fee includes tender information and responses to builder queries. Clear drawings reduce assumptions, but they cannot remove every concealed condition or replace competent site work.
Fees: compare the scope before comparing the number
Design fees may be fixed for a defined package, charged by time or calculated as a percentage of the construction cost. As rough guide ranges only, not quotes, architect fees for a broad service on a domestic extension may fall around 8%–15% of construction cost, while limited drawing packages can use a very different basis. Project complexity and the extent of construction-stage involvement strongly affect the figure.
As a rough guide range only, not a quote, a limited survey and drawing commission for a straightforward domestic extension might be around £2,000–£6,000 before VAT where chargeable. Do not treat that as a complete design budget. Structural engineering, specialist surveys, planning charges, building control charges and contract administration may be separate.
Ask whether VAT, travel, revisions, application handling and meetings are included. Establish how many options are allowed and what happens if the brief changes or permission is refused. For percentage fees, clarify the cost definition and how later cost changes affect payment. For time charges, request an estimate, reporting arrangements and authorisation limits.
The cheapest appointment can become expensive if crucial coordination is missing. Compare written deliverables and responsibilities side by side, and ask for a staged proposal if you are not ready to commission the full project. Confirm the right to use the drawings for your project and the terms if the appointment ends early.
Using your own plans and agreeing responsibilities
Your own sketches can communicate the brief very effectively. They can show furniture, important views and what is frustrating about the present layout. Unless they have been developed into competent technical information, however, they should not be treated as ready-to-build instructions. Someone still needs to check dimensions, structure, regulations, drainage and practical construction details.
FirstR8 Builds works with experienced local architects and can work from the homeowner’s own plans. Bring the latest drawings, approvals and calculations to the free, no-obligation initial site consultation so their status can be discussed before a detailed quote. Make clear whether the documents are ideas, planning drawings or a coordinated technical package.
Before construction, record who is responsible for design development, approvals, engineering coordination and answering site questions. England’s Building Regulations dutyholder arrangements can require appointments including a principal designer where more than one contractor is involved; this is distinct from the CDM health and safety role, even if the same person fills both. Ask your advisers to confirm the applicable duties rather than assuming they disappear on a domestic project.
Frequently asked questions
- Is an architect legally required for an extension?
- Not generally. The design still needs to meet the relevant legal requirements, and the people undertaking design must be competent for their work. Complex or sensitive projects may benefit greatly from an experienced architect.
- Can a structural engineer do all the drawings?
- Some engineers offer broader design services, but structural calculations alone do not replace layout design, planning information or a coordinated building regulations package. Confirm the actual service rather than assuming all drawings are included.
- Can a builder price from planning drawings?
- A builder can provide an estimate with stated assumptions, but reliable comparison is harder when construction details and specifications are missing. Ask what is excluded or provisional before treating it as a settled project price.
- Does planning approval mean I can start building?
- Not by itself. Building regulations, planning conditions and other permissions or agreements may still need attention. Confirm the required approvals and technical information before arranging a start date or placing major orders.
- Will the designer visit during construction?
- Only to the extent agreed in the appointment. Ask about visit frequency, reporting and authority to instruct changes. Periodic visits are not continuous supervision and do not replace the builder’s responsibility for carrying out the work properly.