Preparing your home for building work

Last updated

Once the plans are approved and the start date is booked, there is a lot to do before the builders arrive. Good preparation keeps the work moving, protects your belongings and makes living through the project easier.

This guide gives a practical checklist for the weeks before work starts. FirstR8 Builds carries out extensions, refurbishments, kitchen installations and conversions, and offers a free, no-obligation initial site consultation.

Home refurbishment work by FirstR8 Builds, West Sussex

In short

Clear and protect the rooms being worked on and the routes through the house, agree access, parking, toilet and storage arrangements with your builder, tell your neighbours, set up a temporary kitchen if needed, and plan for children, pets and working from home. Agree who orders what and when, and keep a list of decisions to be made.

Agree the arrangements with your builder

Before day one, agree:

  • Working hours and noise.
  • Access, keys and alarm codes.
  • Parking and where materials and skips will go.
  • Toilet and welfare facilities.
  • Where tools and materials are stored overnight.
  • Who orders which items, such as the kitchen, tiles and sanitaryware.
  • How you will communicate and when you will meet.

Clear the area

Empty the rooms being worked on completely, including curtains, pictures and light fittings that may be damaged. Clear the routes the trades will use, such as hallways and stairs. Take down fragile items in rooms nearby, as vibration and dust travel.

Protect the rest of the house

Dust gets everywhere. Builders usually protect floors along working routes and seal openings with dust sheets or temporary screens, but it helps to cover furniture in nearby rooms, store valuables elsewhere and close doors. Agree what protection the builder will provide.

Tell your neighbours

Let neighbours know when work starts, how long it will last and what to expect: noise, deliveries, skips and scaffolding. If the work involves a party wall, notices may be needed in advance; our Party Wall Act guide explains when. A friendly conversation early on prevents many problems.

A temporary kitchen

If the kitchen is being replaced or extended, set up a temporary kitchen elsewhere with a microwave, kettle, toaster, fridge and somewhere to wash up. Plan simple meals, and consider how long you will be without a kitchen.

Utilities

Ask the builder when water, power or gas will be switched off. Know where the stopcock, consumer unit and gas meter are. If the boiler is moving, plan for hot water and heating.

Children and pets

Building sites are dangerous. Keep children and pets away from the work area, agree safe zones and explain the rules. Pets may be stressed by noise; some owners use boarding or relatives during the noisiest stages.

Working from home

Noise is often worst during demolition, structural work and drilling. If you work from home, plan where you will work, or consider working elsewhere on noisy days. Ask the builder which days will be the loudest.

Decisions and orders

Many delays come from items not chosen or ordered in time. Make a list of decisions: tiles, flooring, sanitaryware, door handles, light fittings, paint colours. Agree deadlines with your builder based on the programme, and check lead times on items like kitchens, windows and doors.

Paperwork

Keep copies of planning permission, Building Control approval, party wall agreements, structural calculations, quotes, contracts and any warranties in one place. You will need them during the work and when you sell.

Insurance

Tell your home insurer about major building work, as it may affect your cover. Check the builder's insurance too.

Moving out

For big projects, such as full refurbishments, structural work across the house or extensive rewiring, it may be easier to move out for part of the work. Think about whether staying is realistic. Our refurbishment guide covers living through the work.

During the work

Once work starts, keep a notebook or shared message thread for questions and decisions, and check progress regularly without slowing the trades down. Walk round with the builder at agreed points, for example before plastering, so you can confirm socket positions, lighting and pipe runs while they are still easy to change. Keep the house as tidy as possible outside the work area, and keep your own valuables and documents somewhere secure. Expect some disruption, dust and noise on most days, and be ready for the occasional delay caused by weather or deliveries.

Near the end

Plan the final clean, the arrival of furniture and any decorators. Arrange a snagging walk-round with the builder before final payment; our snagging guide explains how.

Mistakes to avoid

Avoid leaving rooms half cleared, forgetting to tell neighbours, ordering items late, not agreeing parking and skip locations, and assuming the builder will provide things they have not quoted for.

Frequently asked questions

How do I prepare my house for builders?
Clear the work area, protect belongings, agree access and parking, tell neighbours and plan for utilities, children and pets.
Should I move out during building work?
For small projects most people stay. For major work across the house, moving out for part of it can be easier.
How do I live without a kitchen during building work?
Set up a temporary kitchen with basic appliances and plan simple meals for the period.
Do I need to tell my neighbours about building work?
It is courteous, and if the Party Wall Act applies, formal notice is required.
Do I need to tell my insurer about building work?
Yes. Major building work can affect home insurance, so check with your insurer.

Talk to us about your project

Book your free, no-obligation initial site consultation. We cover Bognor Regis, Littlehampton, Chichester, Worthing, East Preston, Findon, Rustington.

07346 814853

Unit B, Lelliot and Co, Ash Grove / Heath Place, Bognor Regis PO22 9SL · Monday to Friday, 8am – 7pm