Setting a renovation budget and contingency

Last updated

Most building projects that go over budget do so for predictable reasons: things that were never included, decisions made late, and problems found once walls and floors are opened up. A realistic budget, set before work starts and reviewed as the design develops, makes the whole project calmer.

This guide explains what to include, how to compare quotes and how to keep a contingency. It gives no prices, because every project differs; it focuses on how to plan. FirstR8 Builds carries out extensions, refurbishments and conversions and offers a free, no-obligation initial site consultation.

House refurbishment in progress by FirstR8 Builds, West Sussex

In short

Build your budget from the full list of costs, not just the builder's quote: design and engineering, approvals, building work, fittings, finishes, furniture and VAT. Keep a contingency, many people set aside a percentage, for the unexpected. Compare quotes on the same specification, understand provisional sums, and make decisions early to avoid changes later.

What a full budget includes

A complete project budget usually covers:

  • Design: architect or designer drawings.
  • Structural engineer calculations.
  • Planning application and Building Control fees.
  • Party wall costs where they apply.
  • Surveys, such as measured or drainage surveys.
  • The building work itself.
  • Kitchen, bathroom, flooring and other fittings, if not in the quote.
  • Decoration, furniture, blinds and landscaping.
  • VAT where it applies.
  • Moving out or storage, if needed.
  • Contingency.

Understanding the builder's quote

A good quote describes what is included and what is not. Look for:

  • A clear scope of work and specification.
  • Provisional sums: allowances for items not yet defined, such as a kitchen or tiles.
  • Prime cost sums: allowances for items you choose later.
  • Exclusions: work not included.
  • Payment stages and how variations are priced.

Provisional sums

A provisional sum is an estimate for something not yet known. If you then choose a more expensive kitchen or tiles than allowed, the cost goes up. Ask how each sum was set and whether it matches the quality you want.

Comparing quotes

Quotes are only comparable when they cover the same work to the same specification. A cheap quote may exclude items another includes. Put the quotes side by side and check scope, materials, allowances and exclusions. Ask questions about anything unclear. Our choosing a builder guide lists more questions.

Why a contingency matters

Older houses in particular hide surprises: rotten timbers, old wiring, poor foundations, drains in the wrong place, or walls that are not what they seemed. A contingency covers these without stopping the project. Many homeowners set aside a percentage of the build cost, with more for older properties or major structural work. If it is not needed, it can go on finishes at the end.

Hidden and forgotten costs

Common items people forget include:

  • Moving or upgrading drains and services.
  • Boiler or electrical upgrades needed for the new space.
  • Making good to existing rooms.
  • Skip hire and waste, if not included.
  • Temporary kitchens or living arrangements.
  • Landscaping and paths after an extension.

Avoiding changes

Changes during the build are a major cause of overspending. Each change may affect work already done, materials ordered and the programme. Making decisions on layout, fittings and finishes before work starts keeps costs stable.

Phasing the work

If the budget is tight, consider phasing: build the structure now and do some finishes later, or do one floor at a time. Some work is cheaper to do together, such as first-fix services before plastering, so plan what can sensibly wait.

VAT

VAT applies to most building work. There are some reliefs for specific situations, such as certain conversions or long-empty homes, but these have strict conditions. Check whether quotes include VAT.

Keeping track

Keep a simple spreadsheet of costs, payments and changes. Agree variations in writing before they are carried out, with their price. Regular site meetings help keep everyone on the same page.

Where to spend and where to save

Spend where it is hard to change later: structure, insulation, drainage, wiring, windows and doors, and the layout. These are disruptive and costly to redo. Save, if you need to, on items that are easy to upgrade later, such as light fittings, taps, door handles, paint and some furniture. It is also worth asking your builder about alternatives that achieve the same result for less, such as standard-size windows instead of made-to-measure, or a simpler roof shape.

Getting the timing right

Set your budget before detailed design, then check it again once drawings and structural calculations are done and quotes come in. Many projects change shape at this stage. It is better to adjust the design on paper than on site.

Mistakes to avoid

Avoid budgeting only for the builder's quote, ignoring fees and fittings, having no contingency, accepting the cheapest quote without checking scope, and making late changes.

Frequently asked questions

How much contingency should I keep for building work?
Many homeowners set aside a percentage of the build cost, often more for older houses or structural work. Discuss it with your builder.
What is a provisional sum?
An allowance in a quote for work or items not yet defined. The final cost may go up or down.
Why are building quotes so different?
Quotes may cover different scopes, specifications and allowances. Compare them on the same basis.
Does building work include VAT?
Most building work carries VAT. Some reliefs exist, but they have strict conditions.
How can I avoid going over budget?
Plan the full budget, keep a contingency, make decisions early and agree changes in writing.

Talk to us about your project

Book your free, no-obligation initial site consultation. We cover Bognor Regis, Littlehampton, Chichester, Worthing, East Preston, Findon, Rustington.

07346 814853

Unit B, Lelliot and Co, Ash Grove / Heath Place, Bognor Regis PO22 9SL · Monday to Friday, 8am – 7pm